Frame a wall, size the floor joists, board-foot the joist run (the joist count drives the board-foot quantity), then total the material order with waste and tax.
trades 4 steps 4 live tools
framingfloor-joistboard-feetbill-of-materialsFill the inputs and press Run — every step executes live and the JSON chain (each step's tool, args and result) appears here.
curl -s https://wingmanprotocol.com/agents/templates/frame-and-order-lumber/run \
-H 'Content-Type: application/json' \
-d '{"total_wall_lf": 48, "wall_height": 9, "span": 14, "room_width": 12, "items": [{"item": "2x6-16 stud", "qty": 40, "unit_cost": 9.5}, {"item": "OSB sheathing", "qty": 18, "unit_cost": 42}], "waste_pct": 10}'